Project Type:
Feasibility Study
Technology:
Wind
Country:
Romania
Project Status:
Completed
Project Start:
2004
End of Project:
Contract:
2004.04
Documentation
Swiss Contribution
Swiss experience in wind farm planning forms the basis of this project, which includes cooperation with interested local partners.
Description
In the port of Constanta, Romania, site suitability for Wind Power Plants (WPP) should be clarified and established. The project envisions the design of a first wind farm in the port area, with about a 30 MW capacity expected in annual energy production (following deduction of safety margins); and approximately 80,000 MWh can be expected.