CEAS – Madagascar II

Swiss Partners

CEAS Centre Ecologique Albert Schweitzer,Neuchâtel,
www.ceas.ch,
Daniel Schneider

Project Type:

Pilot project

Technology:

Small Hydropower

Country:

Madagascar

Project Status:

Completed

Project Start:

2012

End of Project:

2016

Contract:

2012.03

Documentation

Swiss Contribution

The Swiss partner has extensive experience with training projects in developing countries. Additionally, Swiss small hydropower technology shall be used.

Description

The Pico hydro turbines developed in a previous CEAS project were installed at nine locations in Madagascar. These turbines meet electricity demands at the family level. In this project, Robust and durable Pico turbines that are oriented to a higher output of 3-10 kW shall be developed, in order to meet electricity demands at the community or village level.

The three pilot sites should be equipped with Pico turbines in three stages: At the first location, the turbine which has already been installed shall be enhanced by the ADEVE partner; a second site shall be equipped with a turbine which has been partly manufactured in Madagascar. At the third site, a Pico turbine that has been completely manufactured in Madagascar shall be installed at the project’s end.

A specially equipped workshop shall be built for this turbine manufacturing. Malagasy staff is then trained to correctly size the material and to be able to manufacture small hydro turbines in Madagascar. A special socio-economic approach is applied to each site, in parallel. Based on payment for the electricity, a fund for the equipment’s operational care and maintenance shall be ensured through the payment for electricity generated.